Design requirements for food plant construction drawings?

Author: Shenzhen Zhongjing Global Purification Technology Co., Ltd.issuing time:2018-07-23 20:35:02Pageviews:3619smallinBig

The construction drawing design of the food factory mainly transforms the design concept and design intention of the engineering and technical personnel into the engineering executable language, whi...

    The construction drawing design of the food factory mainly transforms the design concept and design intention of the engineering and technical personnel into the engineering executable language, which is embodied in the drawings, and then through manufacturing, construction and installation, the whole design project is changed from the idea to the reality; the construction drawing design It is a very specific, practical and meticulous design work that reflects design ideas in engineering language. It requires high-tech and technical personnel to have a high level of science and technology and rich practical experience; construction and installation are in accordance with the drawings. The construction drawing is of good quality, the construction will be smooth, and the production will be smooth. On the contrary, it will affect the progress of the whole project. The design basis of the food plant construction drawing is the approved preliminary design or technical design and approval opinions; the main equipment technical materials and product samples ordered by the construction unit; the agreement signed by the construction unit and each cooperation unit and each department; Technical data, product samples, national standard atlas, enterprise standard atlas of various regional departments, construction regulations and installation methods of construction and installation units.


    The design content and complexity of the construction drawings are also related to the technical level of the construction and installation units. For the construction and installation units with strong technical strength, rich experience and accumulated technical data, many common drawings can be simplified or omitted. Process part: including production flow chart, workshop process equipment layout plan, elevation plan, pipe layout plan, section or perspective view, equipment installation diagram, console, equipment and pipe supports, hangers, pipe parts, tools and equipment Table, material summary table, etc.; power part: including boiler room, air compressor station, freezer and cold storage equipment layout diagram, installation diagram, pipeline flow chart, pipeline insulation structure diagram, equipment room and plant pipeline layout diagram, main support, Hanging map and equipment table, material table, etc.; civil engineering part: including general layout plan, plant earth balance map, architectural plan of some buildings, elevation, structure and section, various node details, selection Standard maps, general maps, door and window diagrams, etc., building walls, roads, and channel structures. Zhongjing Global Purification can provide consulting services, consulting, design, construction and decoration services for food factories and food purification workshops.


    Food plant construction drawings for water supply and drainage: including water supply, drainage, water treatment, sewage treatment equipment layout, pipeline layout, plant drainage manhole, fire protection system, cooling tower and recycling water, wastewater recycling and equipment table, living room, sanitary equipment, bathroom Drainage pipe arrangement; heating and ventilation part, including ventilation, dust removal, heating, air conditioning equipment and piping layout, system diagram, pipeline installation and construction details, material list, general drawing and equipment table; instrument and automatic control part: including production process Flow, quality, liquid level, temperature, pressure of various media, indications of instruments, signals, schematic diagrams of adjustment systems, instrument panels, instrument cabinet layout diagrams, wiring diagrams and material tables, circuit diagrams; power supply: including Substation, high and low voltage power distribution room equipment layout, lighting wiring diagram, factory wiring system, lightning protection, communication, non-standard power distribution cabinet wiring diagram, installation details and equipment table, material table, lighting wiring diagram; construction instructions : The construction instructions including the various professional types of work are different, and the construction requirements of the process are required to install the equipment.

2018-07-23 3619People browsing
Undertake: sales and installation of purification equipment across the country

Get quotes quickly

*The quotation will be sent to your mobile phone as a text message or contact a professional technician to contact you.

主站蜘蛛池模板: 久久女性裸体无遮挡啪啪 | 久久99亚洲精品久久频 | 情人伊人久久综合亚洲 | 成人免费一区二区三区视频网站 | 久久国产免费看 | 日韩女人一级 | 亚洲国产精品婷婷久久久久 | 人妻无码一区二区三区TV | 欧美videos极品另类 | 四虎影院在线免费观看 | 欧美一二区 | AV无码中文字幕不卡一区二区三区 | 国模芊芊大尺度啪啪 | 男女XX00上下抽搐动态图 | 色噜噜狠狠色综合免费视频 | 91久久人澡人人添人人爽 | avhd高清101在线谜片最新 | 国产福利永久不卡在线观看 | 桃子视频在线观看免费视频网 | 日本少妇高潮喷水XXXXXXX | 一本无码中文字幕手机在线 | 全黄性性激高免费视频 | 婷婷久久无码欧美人妻 | 日韩在线视频免费观看 | 在线免费观看黄色 | 亚洲AV成人片无码 | 日韩精品美腿丝袜 | H精品动漫在线无码播放 | 女人和拘做受全程看免费软件 | 欧美黄一级 | 春色影视| 久久影院国产 | 日韩av男人的天堂 | 中文字幕无码久久一区 | 亚洲人成77777在线播放网站 | 欧区一欧区二欧区三免费 | 欧美精品一区二区三区免费视频 | 国产一区二区国产 | 色情WWW成人片WWW222 | 日韩视频在线观看中文字幕 | 播五月开心婷婷欧美综合 |